I.    CALL TO ORDER:         Chair Bulach opened the meeting at 7:00 p.m. 

 

II.  APPROVE AGENDA:      Chair Bulach if there were any comments or corrections to the June 20, 2007 Commission minutes as presented and there was no response.
     
Commissioner Svendsen moved to approve the June 20, 2007 Planning Commission minutes as presented, seconded by Commissioner Wahlstrom and carried. 5-0.
 

III.A.   Public Hearing: Consideration of Site & Building Plan Review/Conditional Use Permit/Variance for
             Construction of a New Home on a Non-Conforming Lot of Record  located at 120 Salem Church Road,
             Richard and Tracy Noble.

 

Chair Bulach opened the public hearing to consider the request for a Site and Building Plan Review, a Conditional use Permit and a Variance for construction of a new home on a non-conforming lot of record at 120 Salem Church Road. He explained the procedures for conducting the public hearing and asked the Planner to describe the request.       

Planner Smith explained that the JMS Custom Homes LLC, on behalf of the property owners are requesting approval of site and building plans to allow construction of a new home on an existing non-conforming lot of record. She stated the property is zoned R-1, Single Family Residential and is not located within the Aircraft Noise Abatement zone or the Shoreland Overlay District.  She advised the site currently contains a single family home and a detached garage and the locations of the buildings do not comply with required setbacks, thus rendering them non-conforming. She noted the lot contains 2.52 gross acres, but after accounting for the Salem Church Road right-of-way and slopes in excess of 12 percent, the lot is less than the required 2.5 acres. She explained the applicant wishes to tear down the existing structures and construct a new home with an attached garage on the site; the request requires approval of a CUP to allow for redevelopment of a substandard lot.

The Planner stated that the applicant is also requesting approval of a 50-foot variance from the side yard setback, along Salem Church Road, for construction of the new home. She noted that the although the home accesses off of Salem Church Road along the north lot line, the front lot line is actually the east lot line; she explained that based on the Zoning Ordinance definition of a front lot line, the boundary abutting a public right-of-way or private access road having the least width is considered the front lot line. She stated that the proposed new home is consistent with the front, south side and rear setbacks; however, the proposed home does not meet the required side yard setback for the north side and thus the applicant is requesting a variance from both side setbacks. She further explained that the proposed home is consistent with the lot coverage and height requirements; the height distance over grade being 29.84 ft.

Commissioner Votel questioned the current setbacks on the existing home location. Planner Smith stated the existing home is 27 ft. from the Salem Church Road right-of-way.

The Planner reviewed the building materials and lighting plan for the proposed new home. She explained that the landscape plan shows15 trees would be removed to accommodate the new home and that the City Forester has reviewed the tree removal plan and finds no issue with the proposal; she noted that the applicant proposes to add a significant number of trees to the site, 27, along with other plantings as shown on the landscape plan. She also advised that the site will be landscaped using natural stone retaining walls and outcroppings to provide adequate screening from adjacent properties. She stated that the plan meets the ordinance criteria.  

Commissioner Votel asked if most of the tree removal would occur to the south and west of the existing home location. The applicant responded yes.

Planner Smith stated that staff has found the proposal meets the Site and Building Plan Review Criteria and also the Conditional Use Permit criteria for a substandard lot, as outlined in her report dated October 10, 2007. She stated the Variance request does not violate the intent of the Comprehensive Plan, which encourages redevelopment efforts of substandard and/or non-conforming buildings and properties. She advised that staff found the identifiable hardship based on the shape of the lot and the lot’s location adjacent to two roadway right-of-ways which reduces the buildable area of the lot to an unreasonable amount for construction of a new home. Staff also suggests that the hardship would be due to the narrowness of the lot and the insufficient buildable area when all required setbacks are applied. She stated that literal interpretation of the Zoning Ordinance would deprive the applicant of rights commonly enjoyed by other properties in the same district, due to the narrowness of the lot and granting the variance would not create an inconvenience to neighboring properties and uses since the existing and proposed topography and vegetation will adequately screen the home from adjacent lots.

Staff recommends approval of the requests, subject to the conditions as listed in the Planner’s report dated October 10, 2007. 

The Planner noted that the City Septic Inspector had reviewed the design for the septic system and found it to be in compliance with the regulations; she noted there were 12 recommendations listed in the inspector’s report dated October 10, 2007.

Planner Smith also reviewed the Engineer’s report dated October 10, 2007 and noted that following recommendations:

The existing structure be reviewed and certified for hazardous materials and that all materials identified must be removed and disposed of according to current requirements.

The existing well and septic tanks must be property abandoned.

 

Due to the fact the proposed site work disturbs more than an acre an NPDES Permit for grading is required.

 

The proposed well site is located adjacent to the driveway and is beyond the setback limits from the septic drain field; the well site is located within the drainage swale from the driveway and needs to be located so that drainage is away from the well site.

Any retaining walls over 42 inches in height must be certified by a structural or soils engineer.   

 

Chair Bulach noted the Engineer’s recommendation that no vehicles shall be parked on Salem Church Road during construction and that all vehicles and materials shall be within the limits of the applicant’s property.  He asked if the applicant was aware of this recommendation.

Andy Porter of JMS Custom Homes stated he was aware of the recommendation. He explained that he worked with the City Planner to design the home on the lot and attempted to meet the City criteria based on the narrowness of the lot. He stated that he believes the home is sited in the best location on the lot.

Chair Bulach asked when applicant proposes to start construction of the home due to the demolition.

Mr. Porter advised that his company prides itself on moving quickly and that normally construction of home is accomplished within six months from the start date; he indicated that as soon as the demolition occurs and a building permit is issued he plans to begin construction.   

Chair Bulach asked if there were any comments from the audience.
Steven Bulach explained that he is an adjacent neighbor and that he believes the home will fit well in to the neighborhood. He stated he does not believe the location of the home will disturb his privacy and he supports the variance request based on the fact that the new home would be an improvement to the neighborhood.  

Chair Bulach noted that on Exhibit E-3 the plan shows drainage going towards the home and asked if this was an error. Mr. Porter stated it is an error and he would correct the drawing.

Commissioner Votel asked the Planner if the City Engineer had suggested some type of remedy for the drainage swale location as discussed in his report or if a condition should be attached to require this be clarified.

Planner Smith explained she is unsure of the Engineer’s recommendation but that she would attempt to clarify his intent prior to Council review. She noted that the applicant works closely with staff on such issues when an application is made for the building permit.

Commission Votel explained that he had received an email from a resident objecting to the variance request and that he had forwarded the information to the Planner. He stated he asked the Planner to compile a map showing contiguous properties and the setback location of the homes on these parcels which would show other variances in this area; he thanked the Planner for the map she distributed. He pointed out that based on the diagram he would support the variance request since other homes in the area had more options for building location. He indicated that he believed it would be helpful for the Commission to see the setbacks for other homes in the area that did not have to deal with setbacks from two roadways. He stated he believes the hardship is clearly evident and that one of the neighbors most affected by the variance supports the request.

Planner Smith agreed and noted that other properties front on Salem Church Road have more acreage than the applicant’s lot.   She explained she tried to find information on other variances in the area, however, since her firm was not serving the City in earlier years, it was difficult to find information.

Commissioner Svendsen asked if the 50 foot variance on the north side of the home was from the base of the foundation or to the covered porch. The planner explained that the porch is part of the structure and therefore the measurement was from the porch.

Chair Bulach asked if the swimming pool was considered as part of the application.

Andy Porter indicated that the applicant had not determined if the pool would be installed due to budgetary considerations and therefore approval with or without the pool would be fine.

Planner Smith explained it was an option however she noted the applicant would still need to obtain a permit for the pool. She advised that if approval is granted with the pool in its present location the applicant would not have to revise the plan or return for further approval.

Commissioner Wahlstrom asked if the pool could be approved without specifications. Planner Smith explained that the pool fits in as part of a Major Site Plan review and therefore either way the plan is approved, staff believes the pool location would not present any issues.

Chair Bulach asked if there would be any accessory buildings for the pool. Mr. Porter responded no.

Commissioner Svendsen asked how the applicant would prefer to proceed with the approval.

Commissioner Votel indicated it would be preferable to include the pool as part of the approval.

Chair Bulach pointed out that if the pool is not constructed within two years the applicant would need to reapply.

After discussion the Commission concurred that it would be appropriate to include the pool aas part of the application.

Commissioner McCue asked if the pool location would affect the watershed and if the City Engineer had reviewed the pool as part of the grading plan. She noted that when the Commission granted approval of another building plan with a pool a rain garden was included as part of the requirements. She indicated she would prefer to require a rain garden on the site as suggested by the City Engineer.

Mr. Porter explained that he read the recommendation of the engineer and he believes it is a good idea to capture drainage; he stated he has no objections to installing a rain garden.

Planner Smith explained that the City Engineer did review the drainage plan which included the pool. She pointed out that the Engineer’s report noted the total imperious surface area of the lot does not exceed requirements for the installation of storm water management facilities and that he encouraged the applicant to construct a rain garden or small ponding area for collection of runoff from the driveway.  She stated she could clarify the matter with the City Engineer.
 

Chair Bulach asked for further comments and there was no response.  The public hearing was closed at 7:30 p.m.  

 

Commissioner Votel moved, seconded by Commissioner Wahlstrom, to recommend approval of the following requests for property located at 120 Salem Church Road:
 
1)  A Conditional Use Permit to allow the redevelopment of a non-conforming lot of record known as 120 Salem Church Road based on the finding that the request is consistent with the requirements of the Zoning Ordinance and the intent of the Comprehensive Plan and will be compatible with surrounding land uses.

2) A 50-foot  Variance to allow the construction of a new home 50 feet from the side yard property (right-of-way) line abutting Salem Church Road based on a finding that non-economic hardship has been demonstrated, as outlined in the Planner’s Report dated October 10, 2007.

3) Site and Building Plans to permit the construction of a new home at 120 Salem Church Road, subject to the eight (8) conditions as listed in the Planner’s Report dated October 10, 2007.

and further recommended,  that the above-listed approvals are subject to the Planner’s confirming with the City Engineer the issues related to the proposed drainage swale and also confirmation that the swimming pool was reviewed as part of the plans.

In discussion Commissioner McCue stated she preferred to include the rain garden as part of the conditions.  

Motion carried unanimously. 5-0

Planner Smith advised this matter would be heard before Council at their meeting on November 6 and advised the applicant that the meeting would not begin until 8:00 p.m. due to the election.


IV.
OTHER/NEW  BUSINESS - November Meeting Date& Comprehensive Plan Update Open House: 

Planner Smith explained that the regular planning meeting in November is scheduled on the Wednesday prior to the Thanksgiving Holiday; she suggested an alternate date be selected. She also noted that an Open House to discuss the Comprehensive Plan Update should be scheduled in November or December since she would be on maternity leave in January, 2008.

Chair Bulach asked if there were any applications submitted for that meeting; Planner Smith responded no, but explained that Council had requested the Commission conduct a public hearing regarding the proposed ordinance amendment relating to requiring only escrow accounts and removing the letter of credit option from the City Code.

Commission concurred to schedule the Open House for the Comprehensive Plan Amendment at 7:00 p.m. on November 28, 2007 and the regular Planning Commission meeting would be rescheduled to the same date at 6:30 p.m. 

 

Chair Bulach explained that in his opinion the City regulations should designate a reference point on the property from where the building height is measured to insure that structures do not exceed the 30 ft. height requirement. He suggested that the architect should designate a reference point on the property and questioned if anyone ever checks to insure that structures do not exceed the height requirement.

Planner Smith explained that the height measurement is taken from the first floor elevation to the peak of the roof of the structure.

Commissioner Votel asked if the measurements are taken during pre and post construction. He suggested the structure should meet the 30 foot requirement from the existing grade.

Planner Smith explained the calculation is from where the actual first floor elevation is located to the peak of the roof.

Chair Bulach pointed out that landscape plans are not always correct and the first floor elevation could change.

The Planner explained that the plan denotes the first floor elevation and that does not change.

Chair Bulach stated that when a bridge is constructed the surveyor has a reference point.

 

Commissioner Svendsen suggested that the Commission may wish to pose the question to the City Engineer as to whether or not a reference point would be appropriate.

Chair Bulach suggested that the contractor would mark a reference point on the site prior to construction. Commissioner Votel agreed that once the home is completed the reference point would not change.

Planner Smith suggested that she would discuss the issue with Engineer Hanson and have him contact Chair Bulach. She reiterated that the first floor elevation is shown on the plan and does not change.

Commissioner Votel noted that the landscape plan for his neighbor’s home had changed and now includes an entire yard of grass when it was supposed to be left natural; he indicated he would have strongly urged berming of the property if he had known the neighbor was installing grass and golf tees.

Commissioner McCue indicated that requiring a larger escrow amount when making application for new home construction may discourage deviating from the plan.

Planner Smith indicated the major problem with plan deviation is enforcement and that staff would need support from Commission and Council to proceed with enforcement.

Commissioner Wahlstrom commented that other communities would make the residents remove items that were not part of the original plan.

Chair Bulach asked how the Commission would assist with inspections to insure that the plans are not changed.

Commissioner McCue suggested that the Commission discuss the inspection process with Russ Wahl.

Commissioner Votel commented that the Commission could recommend to Council to review the enforcement issue and provide better enforcement.

Planner Smith explained that an inspection is completed prior to issuing a Certificate of Occupancy, but no measurements are taken; she indicated that Council should determine to what extent they wish to have staff scrutinize each site.




Commissioner Votel also noted that his neighbor’s pool shifted substantially north and closer to his property; he believes there are too many “loose ends” in the inspection process. He commented that he believes the City needs to decide to aggressively pursue the violations.

Planner Smith pointed out that the City would have to hire a surveyor to verify the location of structures and pools.

Commissioner McCue pointed out that it should be the homeowner’s responsibility to verify that the locations are correct as shown on the plans and approved by the City.

Planner Smith stated that normally staff can determine if the plan is similar to the one approved, however; staff cannot determine if the locations are surveyed properly.

There was resolution or further discussion on the matter.
 

Chair Bulach asked if there were any further items for business and there was no response.

 

 

V.      ADJOURN:  Commissioner McCue moved, to adjourn the meeting at 8:05 p.m, seconded by Commissioner Svendsen and carried. 5-0

 

Catherine Iago, City Clerk